PGN | 64770 |
---|---|
PG Label | All implements stop operations switch state |
PG Acronym | AISO |
PG Notes | This message may be sent by any control function (CF) connected to the implement bus on forestry or agriculture implements providing to connected systems the current state of the all implement stop operations switch. At least one of these switches shall be in each operator location of the connected system. All implements shall start a process to stop all operations when this broadcast message is received from any CF with a value of “Stop implement operations” (SPN 5140).. Before an implement turns off all implement operations, it shall assume a failsafe condition. If an implement is operating in an automation mode, it may enter a failsafe condition before requesting the tractor ECU to exit the automation mode, e.g. PTO, Auxiliary valve, and/or tractor movement. The working set master for the implement shall then inform the operator that the implement has stopped all operations due to the activation of the Stop All Implement Operations switch. Implement working set masters shall include, on their home screen, an indication, e.g. icon or a function name, if it supports Stop All Implement Operations. The Working Set shall monitor the number of transitions for each ISB server upon receiving first the message from a given ISB server. A Working Set shall consider an increase in the transitions without detecting a corresponding transition of the Stop all implement operations state as an error and react accordingly. |
Pgn Notes | - |
EDP | 0 |
DP | 0 |
PF | 253 |
PS | 2 |
Multipacket | No |
Transmission Rate | 1 s and on change of state |
PG Data Length | 8 |
Default Priority | 3 |
PG Reference | Not set |
Sp Start Bit | 7.1 |
PG Document | ISO 11783-7 |
PG Created or Modified Date | 2014-03-31 |
PG SP Mapping Created/Mod. Date | 2014-02-20 |